London office coffee machine installations are simple

The fun part is picking a coffee maker! The practical details show up when it’s installed in an office in London, such as the lift, loading regulations, water supply and confined kitchens. A well thought out installation can be completed in a couple hours and you’ll have a coffee point that functions from day one. If done too quickly or not effectively, it can result in delays, a wasted visit and an unhappy office. The guide is designed to provide information about planning an installation in an office in London, what to prepare and how to avoid some common pitfalls.

Prior to delivery day, plan your installation

The most successful installations are determined early in the process before the machine is received. A little planning with your supplier will ensure that the correct equipment, people and preparations are in place on the day when organizing your office coffee solutions London suppliers provide. Furthermore, it provides you with the opportunity to address any building needs.

Agreeing the Details With Your Supplier

Ensure a date, time window and who will be present is confirmed. Inquire about the supplier’s requirements, for example, access, water or a nearby socket. Ensure that the machine, the materials and the documents are all received simultaneously, so that no one is left waiting. It is helpful to avoid any confusion by sending a brief email summarizing the agreement.

Selecting the proper location

The location of the machine has implications with respect to its effectiveness and utilization. Pick a place close to the socket, if necessary, a water supply, but not in draught or in direct sunlight. Allow space to queue people in the corridor and consider noise in meeting rooms. The right location prevents issues down the road.

The power and plumbing needs of the project.

Power and Water are the two most likely factors to determine an installation. A machine that is placed without checking them can be impossible to use. Knowing what’s required in advance helps you to stay ahead of the curve.

Electrical Supply

Office coffee makers usually take a standard supply, but larger machines might require extra supplies. Need to check power requirements with the supplier. Check the following:

  • Whether a standard socket is suitable
  • Will the process require its own circuit or can it be included in a combination circuit?
  • How far the socket is from the machine
  • If other equipment is on the same circuit

If you’re not sure, consult with an electrician, and it’s always best to ask beforehand.

Water supply and waste.

Some machines have a tank which is filled by hand, and others are directly plugged into the mains. Mains-fed models require access to water supply and a drain (if required) so check the proximity to any suitable water supply, availability of an isolation valve and where waste water will be disposed of if a water filter is fitted.

Where there is hard water, which can cause scale to form and cause a bad taste, filtration is especially beneficial in London.

How to setup the building and working with landlords.

London offices have their own rules and if they are disobeyed, it can delay an installation. Many buildings are very sensitive to deliveries, contractors and lifts use, so it is worthwhile to know in advance what they are.

Access, Lifts and Loading

Deliveries are not permitted in many buildings in the centre of London except at specific times and lifts require a booking for the loading bays. Notify the building manager of the time of arrival of the machine and its size. Inquire about parking, loading bays/clogging up, and provide this information to your supplier. When the engineer knows what he needs to do, he can work without being stalled.

Landlords, Building Managers & Permissions

When you’re renting an office, look through your rental agreement and consult your landlord. Permission may be required in the case of plumbing changes, new connections or changes to the kitchen. Building managers may also request insurance information and/or a method statement. Helpful comments to make are:

  • Whether the plumbing, electrical work or other alterations require permission
  • Any insurance and paperwork needed by the building.
  • Rules for contractors on site
  • Provide access to outside hours.Make outside hours available.
  • When you obtain approval quickly, you don’t have issues at the last minute.

Common trouble areas when installing and how to avoid them.

The majority of installation issues are foreseeable, and can be prevented by some preparation. It’s not always a lack of space, as is often claimed, nor a lack of power, but rather a lack of access, because they’re all the same type of coffee maker, whether it’s a office bean to cup coffee machines or a decanter to pot setup. When you know what to look out for, you can identify problems before the engineer does.

Problems prior to and during the visit.

Common challenges are a machine that is too big for the lift or the doorway, a socket is too far away and a water supply is out of reach. The space may be smaller than expected or the surface may not be able to support the weight. Take all measurements, send pictures to supplier and verify in writing. These issues can usually be resolved with a brief site visit prior to the day.

After the Engineer has gone, here are some problems.

Some problems do not occur until after the machine has been installed, for example: the machine is noisier than shown in the demonstration, the drink tastes different from the demonstration, or the filter was not installed. Test the machine adequately prior to the departure of the engineer, and prepare a few beverages. Inspect for leaks, verify settings and answer any questions that are left. Report any issues immediately, while the engineer is still at the location.

Comprehend the training policies and procedures, and perform first week checks.

The installation is complete after the machine is turned on. It requires your team to understand how to use it and how to take care of it, and some simple checks carried out in the first week ensure that everything is in working order. This is when a new machine becomes a reliable element of the office.

Training and Handover

Let the engineer demonstrate to your team how to use, clean and fill the machine. Save all written instructions, and record the supplier’s contact information and the model and serial number of the machine. Assign one person to be in charge of the day to day operation of the area, to make sure the responsibility is clear. Many questions later are avoided by a brief demonstration.

First Week Checks

Observe the machine in the first week and listen to the feedback from the team. Test for taste, speed and cleanliness and make adjustments as necessary. Record any deficiencies and report them immediately. At the end of the week you will know if it works properly or not, and your coffee point will be able to serve you for years.